The line
Engineering playbooks
1 shipped, 52 more in the year-1 line. One playbook, one engineering workflow, executable the same afternoon: the problem, the method, the prompts, a worked example, a checklist. Checkout runs through Gumroad; Playbook 0 is free.
Shipped

Requirements quality audit
DocumentEngineering Playbook 1
Contactcaxinathlabs.com
DatePlanned

System requirements scaffold
DocumentEngineering Playbook 2
Contactcaxinathlabs.com
DatePlanned
The register
Playbook 0 plus the 52-row year-1 line, in ship order. Planned titles are provisional until shipped.
| No. | Title | Category | Status |
|---|---|---|---|
| 0 | The IP-safe method | Cross-discipline and regulatory | shipped |
| 1 | Requirements quality audit | Systems engineering | planned |
| 2 | System requirements scaffold | Systems engineering | planned |
| 3 | DFMEA jump-start | Systems engineering | planned |
| 4 | Traceability matrix and method assignment | Systems engineering | planned |
| 5 | Customer spec triage and compliance matrix | Systems engineering | planned |
| 6 | 8D corrective action jump-start | Quality and supplier quality | planned |
| 7 | SCAR drafting and response grading kit | Quality and supplier quality | planned |
| 8 | NCR write-up and disposition brief | Quality and supplier quality | planned |
| 9 | Deviation and waiver request drafting | Quality and supplier quality | planned |
| 10 | Tolerance stack-up workflow | Mechanical | planned |
| 11 | Bolted joint sizing workbook | Mechanical | planned |
| 12 | Drawing review checklist | Mechanical | planned |
| 13 | FEA request and interpretation memo | Mechanical | planned |
| 14 | Thermal budget first pass | Mechanical | planned |
| 15 | Test procedure builder | Test and evaluation | planned |
| 16 | Environmental qualification matrix selection | Test and evaluation | planned |
| 17 | Test report writing kit | Test and evaluation | planned |
| 18 | Anomaly and discrepancy report workflow | Test and evaluation | planned |
| 19 | Test readiness review package | Test and evaluation | planned |
| 20 | Program status report builder | Engineering PM and configuration management | planned |
| 21 | ECO/ECN change package builder | Engineering PM and configuration management | planned |
| 22 | Risk register jump-start | Engineering PM and configuration management | planned |
| 23 | Action item and decision log hygiene | Engineering PM and configuration management | planned |
| 24 | Change impact assessment jump-start | Engineering PM and configuration management | planned |
| 25 | EMC pre-compliance plan | Electrical | planned |
| 26 | Component obsolescence and second-source review | Electrical | planned |
| 27 | Schematic review sprint | Electrical | planned |
| 28 | Wire sizing and voltage drop workbook | Electrical | planned |
| 29 | Circuit protection selection dossier | Electrical | planned |
| 30 | Regulatory applicability matrix and technical file scaffold | Cross-discipline and regulatory | planned |
| 31 | Product cybersecurity compliance starter | Cross-discipline and regulatory | planned |
| 32 | Design review prep package | Cross-discipline and regulatory | planned |
| 33 | Product manual jump-start | Cross-discipline and regulatory | planned |
| 34 | Build-to-print RFQ package | Supply chain and sourcing | planned |
| 35 | Engineering services SOW | Supply chain and sourcing | planned |
| 36 | Supplier requirement flow-down | Supply chain and sourcing | planned |
| 37 | Supplier risk assessment | Supply chain and sourcing | planned |
| 38 | Basis of estimate narrative | Cost estimating | planned |
| 39 | Cost model structure jump-start | Cost estimating | planned |
| 40 | Supplier quote normalization | Cost estimating | planned |
| 41 | NRE vs recurring cost split | Cost estimating | planned |
| 42 | Work instruction jump-start | Manufacturing | planned |
| 43 | Core tools alignment audit | Manufacturing | planned |
| 44 | PFMEA jump-start | Manufacturing | planned |
| 45 | FRACAS starter kit | Reliability | planned |
| 46 | Derating and part-stress analysis jump-start | Reliability | planned |
| 47 | Internal audit prep kit (ISO 9001 / AS9100) | Quality and supplier quality | planned |
| 48 | QMS procedure drafting kit (ISO 9001 / AS9100) | Quality and supplier quality | planned |
| 49 | EVMS variance narrative drafting | Engineering PM and configuration management | planned |
| 50 | Decision memo drafting | Engineering PM and configuration management | planned |
| 51 | WBS jump-start | Engineering PM and configuration management | planned |
| 52 | Lessons learned synthesis | Engineering PM and configuration management | planned |